Skip to content
Open
Show file tree
Hide file tree
Changes from 1 commit
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
3 changes: 3 additions & 0 deletions inputs/manual_input.csv
Original file line number Diff line number Diff line change
Expand Up @@ -623,3 +623,6 @@ H2 production biomass gasification CC,VOM,2020,0.46,EUR/MWh_H2,2010,"JRC, 01_JRC
grey methanol synthesis,efficiency,2030,0.569,MWh_MeOH/MWh_gas,2020,"From https://www.sciencedirect.com/science/article/pii/S0016236119311767, table 2, Methanol Synthesis with integrated autothermal reforming. Efficiency is the exergetic efficiency ",
grey methanol synthesis,carbondioxide-output,2030,0.0567742,t_CO2/MWh_gas,2020,"Calculated from the carbon content of gas (0.198 t_CO2/MWh) compared to the carbon content of MeOH (0.2482 t_CO2/MWh)",
grey methanol synthesis,investment,2030,1001188,EUR/MW_MeOH,2020,"Calculated from https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2021/Jan/IRENA_Innovation_Renewable_Methanol_2021.pdf) Table 25 with an exchange rate of 0.8775 EUR/USD and energy content of 5.528 MWh_MeOH/t_MeOH",
Afforestation,lifetime,2025,30,years,-,"https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515",
Afforestation,FOM,2025,5,%/year,2020,"https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515",
Afforestation,investment,2025,7749,EUR/ha,2020,"https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515",
3 changes: 3 additions & 0 deletions outputs/US/costs_2020.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2025.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2030.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2035.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2040.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2045.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2050.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2020.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,6.4,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.6142,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.5,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2025.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,4.6,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.2389,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2030.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,2.8,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.2389,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2035.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,2.8,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.2389,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2040.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,2.8,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.2389,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2045.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,2.8,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.2389,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2050.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,2.8,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.2389,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down