Skip to content

chore(tracker): sync Step 1.5 → ✅ and log PRs #61, #62#63

Merged
officialCodeWork merged 1 commit into
mainfrom
chore/tracker-sync-pr62
May 25, 2026
Merged

chore(tracker): sync Step 1.5 → ✅ and log PRs #61, #62#63
officialCodeWork merged 1 commit into
mainfrom
chore/tracker-sync-pr62

Conversation

@officialCodeWork

Copy link
Copy Markdown
Owner

Summary

Tracker housekeeping after PR #62 (Step 1.5 — Structure-aware chunker) merged to `main`.

  • Flip Step 1.5 row from ⏳ to ✅ with full deliverable summary (rag-chunker package, Chunker SPI, parent-link semantics via heading stack, token-budgeted body chunks, within-section overlap, sentence-boundary fallback, OCR adapter, ragctl chunk command).
  • Phase 1 progress 10/16 → 11/16 done (5 remaining); Total 23/84 → 24/84.
  • Advance Next-action line to Step 1.6 (metadata enricher), noting it operates on chunk output from Step 1.5 before Step 1.7 PII and Step 1.8 embedding.
  • Add PRs chore(tracker): sync Step 1.4 → ✅ and log PRs #58, #59, #60 #61 (Step 1.4 tracker sync) and feat(core,chunker): structure-aware chunker (Step 1.5) #62 (Step 1.5) to the PR & Branch History table.

No source or test changes — pure tracker sync, matches the established pattern of PRs #49, #53, #58, #61.

Documentation

Test plan

  • No code touched; lint/test status is identical to `main`.

🤖 Generated with Claude Code

- Flip Step 1.5 (structure-aware chunker) from ⏳ to ✅; capture the full
  deliverable in the row (rag-chunker package, Chunker SPI, parent-link
  semantics, token budget + overlap, sentence-boundary split, OCR
  adapter, ragctl chunk, schemas, docs).
- Phase 1 progress: 10/16 → 11/16 done (5 remaining)
- Total: 23/84 → 24/84 done
- Advance Next-action to Step 1.6 (metadata enricher) with a note on
  where it sits in the pipeline.
- Add PRs #61 (Step 1.4 tracker sync) and #62 (Step 1.5) to the
  PR & Branch History table.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@officialCodeWork
officialCodeWork merged commit 5ba38ee into main May 25, 2026
9 checks passed
officialCodeWork added a commit that referenced this pull request May 25, 2026
chore(tracker): sync Step 1.6 → ✅ and log PRs #63, #64
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant